
Unified Water Study Documents
2018 Monitoring Group Application Form and Instruction Sheet
The Unified Water Study is currently accepting applications for the 2018 Monitoring Season. The deadline for applications is February 21, 2018.
-
Unified Water Study Application (v2018Feb2)
-
Unified Water Study Instruction Sheet (v2018Jan31)
Quality Assurance Project Plan (QAPP)
“The Quality Assurance Project Plan (QAPP) outlines the procedures a monitoring project will use to ensure that the samples participants collect and analyze, the data they store and manage, and the reports they write are of high enough quality to meet project needs.” (The Volunteer Monitor’s Guide to Quality Assurance Project Plans, US EPA 1996).
Save the Sound is the administrator of the UWS QAPP. Monitoring Groups participating in the UWS are required to adhere to all aspects of the QAPP.
Supplemental Materials
Supplemental materials include individual copies of documents included in the QAPP Adoption Form. Other documents and templates will be available in this section as the UWS progresses.
-
Field and Calibration Datasheet (v2018Feb2)
-
Macrophyte Field Datasheet (v2017Jan13)
-
Macrophyte Field Guide (v2017Jan13)
-
UWS Data Entry Template (v2017Dec13)